We’ll be performing an infrastructure upgrade starting April 22 at 6:00 PM PT (April 23 at 1:00 AM UTC), and it’s expected to take 2–4 hours.
Plasmic should remain available during this time, and we don’t anticipate any disruptions. However, in the unlikely event of any issues, there may be a few minutes of downtime.
Hello, unfortunately, our infrastructure upgrade did not go as planned. While the Plasmic Studio app was working without issues, we faced significant issues with our codegen APIs, which may have affected your production websites. We sincerely apologize for this and are doing a postmortem to prevent this issue next time.
Due to the rollback, we were also forced to rollback our data to the start of the infrastructure upgrade window (approximately Apr 22 6PM PT / Apr 23 1AM UTC). We will be reaching out to affected users and helping restore data where possible.